skip to main |
skip to sidebar
We waited a long time for this, and considered what colours we would go for even longer, changing our mind several times. But finally we got the elite team of six in to plaster the outside of the Hebel cladding. Something like six different layers went on - mesh, various different plaster layers, smoothed off to perfection and finally a painted top layer. It was fascinating to watch the guys at work, operating as a team so that the plaster was troweled on and smoothed out, all in one operation. It took them just over two weeks and the end result is beautiful.
No comments:
Post a Comment